Concrete Cutting

Home » Concrete Cutting

Installing a precast concrete staircase to your house’s basement is really rather a simple job for the advanced doit-yourselfer or anyone that may coordinate several sub contractors. Doing this will add a water tight weather proof egress to your own cellar that, oftentimes, is needed to comply with local building codes during a remodel. Either way, this just added entry will add substantially more function to your house including your cellar.

a36First of all it is likely advisable to describe what precast concrete is. Precast concrete is just concrete that’s been mixed, formed and vibrated in an extremely restricted “plant” type environment and then delivered or trucked to its final destination and installed. Despite the undeniable fact that some precast concrete products are a lot thinner than normal “poured in place” applications doesn’t mean the precast products are any less quality and to the contrary they’re generally a lot more lasting.

As a way to orchestrate this endeavor you’ll to need a hole dug, a doorway opening cut into your base along with the real precast concrete bulkhead delivered and installed. Your initial task would be to find a precast concrete product dealer. A precast concrete dealer could be found in your neighborhood phonebook, or better yet, your on-line yellow pages. You should see the precast manufacturers showroom, which generally includes a field full of stairs, bulkheads and culverts after you have found a reputable dealer. You should pick the fashion and size that’s appropriate for your own job. A normal precast bulkhead will normally cost less than $ 1000 and this contains the steel bulkhead setup and cover.

Once you’ve picked the appropriate product be certain to request a worksheet or specification sheet that accompanies your special product. This “spec sheet” will let you know how much digging must be done and what size doorway your concrete cutter must cut within the basis. The digging could be done using several approaches. You can dig it by hand using a pick and scoop (not recommended), you’ll be able to let a small excavator (cost about $300) from the tool rental outfit and apply the equipment to dig it out or you’ll be able to call a professional excavation contractor and have them dig it out for you (cost between $300 and $500). I strongly recommend employing a professional excavator for this particular section of the job. This procedure is going to have a professional less than several hours and you could shop around to find the best price. Please Note: Be certain to notify your areas “DIG SAFE” plan and have them come out as well as find any secret underground utilities before you begin your excavation. You might be capable of using this soil somewhere else in your property, if this is really not attainable or maybe you are able to give it to 1 of the neighbors. Either way, fill dirt is a really desired and sought after commodity. Thus the old expression: Phil Dirt…the most wanted man in The usa.

After the hole to your bulkhead has been successfully dug out and the part of the base that must be cut is exposed you must clearly layout your cut lines using a measuring tape, a bright yellow lumber crayon and a 4′ level as instructed in the spec sheet. Now it’s time to call a professional concrete cutter to see what their availability and pricing is (price is generally $ 425 / – to cut and drop the bit). They’ll bill about an additional to you $ 100 to jack hammer the piece into manageable bits and up to $ 500 to take out the piece from site. As a way to prevent the break up an disposal costs, just have your own excavation contractor dig a “grave” for the concrete at the base of the excavation. This means you can only bury it and save yourself some time, money and hassles. Describe to the cutter that you want a normal doorway for a bulkhead. Ask them when they could schedule your occupation and how much they charge. Ask them for a morning appointment. So that just as the cutter is done the bulkhead is instantly installed you’re going to possess to organize the concrete cutting along with the bulkhead installation. So you may now schedule your setup and bulkhead delivery for about 12 midday. Most precast concrete product manufacturers can do the setup for you at no additional cost or it’s contained in the cost.

I suggest calling each of the subcontractors a day prior to their own arrival only to check there aren’t any scheduling conflicts. This may reduce the quantity of difficulties that’ll happen and give lots to you of time to reschedule each subcontractor in case that one runs into a problem.

The moment your bulkhead and metal bulkhead cover have been successfully installed you’ll need to “back fill” or replace the soil which was taken out of the hole. This is often done by hand using a shovel by an experienced “do it yourselfer” or you’ll be able to make arrangements to have your own excavation contractor return once the setup is complete and do the backfilling for you. It will always be a great thought to enable this soil to settle before adding your topsoil or planting any grass or blooms. The earth across the bulkhead must be settled fairly good after several heavy rain showers.